The total amount of repair work facing the railroad reconstruction crews in 1862
included twenty-six bridges, ( like the one above -- 127 spans with a
total length of 4, 713 ft.) , 102 telegraph lines, and a pair of water-stations.
Ian McKay, BG, CE, TE |
No comments:
Post a Comment