Friday, June 20, 2014

Railroad Bridge

The total amount of repair work facing the railroad reconstruction crews in 1862
included twenty-six bridges, ( like the one above -- 127 spans with a
total length of 4, 713 ft.) , 102 telegraph lines, and a pair of water-stations.

Ian McKay, BG, CE, TE

No comments:

Post a Comment